APC SRT10000 Smart-UPS Online 10kVA — Quote & Battery Canada

Maximum single-phase online UPS — 10 kVA

APC SRT10000 —
Quote, Battery & Service Canada

The APC Smart-UPS SRT 10000VA (SRT10KXLT) is the largest single-phase online double-conversion UPS in the Smart-UPS family — 10,000 W at unity power factor with zero transfer time. Built for dense server racks, data centre edge deployments, medical facilities, and mission-critical infrastructure requiring maximum single-phase capacity.

APC Service Canada is an independent service provider — not affiliated with APC by Schneider Electric®

Technical Specifications

APC SRT10000 — Smart-UPS SRT 10kVA

SRT10000 (SRT10KXLT) Specifications
Output capacity10000 VA / 10000 W (unity PF)
TopologyOnline double-conversion (VFI)
Form factorRack 6U / Tower
Input voltage208V (hardwired or L6-30P)
Output voltage208V (120V via step-down transformer)
Output connections6 × NEMA 5-20R + 2 × L6-20R + 2 × L6-30R (varies by SKU)
Runtime at half load~8 minutes (5000 W)
Runtime at full load~3 minutes (10000 W)
Transfer timeZero (true online)
Extended runtimeSRT192RMBP2U external battery enclosures
ManagementLCD, USB, serial, SmartSlot (NMC3), EPO, dry contacts
Weight~90 kg with battery
Warranty3-year APC / extended available
Replacement Battery

Battery for SRT10000

🔋 SRT192RMBP2U Battery Enclosure

The SRT10000 uses internal high-rate battery strings and supports SRT192RMBP2U external battery enclosures for extended runtime. Each 2U rack-mount enclosure adds approximately 8 minutes at half load (5000 W). Up to 10 enclosures can be daisy-chained for extended autonomy.

Installation note: The SRT10000 requires a dedicated 208V 50A circuit (hardwired recommended). At 10 kVA, professional electrical installation is mandatory. Our quote includes site survey, electrical assessment, rack mounting, commissioning, and NMC3 configuration.

Runtime planning: At 10 kVA, internal batteries alone provide ~3 minutes — enough for graceful shutdown but not for generator start. Most installations pair the SRT10000 with 2–4 external battery enclosures for 15–30 minute runtime.

Quote SRT10000 + Batteries

✅ Best for

  • Full server rack protection (8–12 servers + networking)
  • Data centre edge / colocation pods
  • Hospital imaging suites and operating rooms
  • Broadcast master control rooms
  • Financial trading floors
  • Maximum single-phase capacity before moving to three-phase Galaxy
Request a Quote

SRT10000 quote — UPS, batteries, installation, commissioning

APC SRT10000 Quote Request

Quote back within one business day. Includes site survey and electrical assessment.

Include in your email:
  • What you need: new SRT10000 / battery replacement / external SRT192RMBP2U enclosure(s) / full installation
  • 208V 50A circuit available? Hardwired or L6-30P plug?
  • Total load, runtime target, rack space available
  • Generator on-site, postal code, timeline

Or email directly: info@apcservicecanada.com · Quote back within 1 business day

FAQ

SRT10000 questions

When should I choose SRT10000 vs Galaxy VS three-phase?
The SRT10000 is the maximum single-phase online UPS at 10 kVA. If your total load exceeds 10 kW, or you need N+1 / 2N redundancy with modular architecture, move to the Galaxy VS (10–150 kW three-phase). The SRT10000 is ideal when your facility has single-phase 208V power distribution and your load fits within 10 kW. We can assess which platform fits your infrastructure.
What electrical circuit does the SRT10000 require?
A dedicated 208V 50A single-phase circuit. Hardwired installation is strongly recommended at this capacity. The SRT10000 also requires a dedicated breaker in your electrical panel. Our installation quote includes the electrical assessment, panel survey, and coordination with your electrician.
How much rack space does the SRT10000 need?
The SRT10000 is a 6U rack-mount unit. Each external battery enclosure (SRT192RMBP2U) adds 2U. A typical SRT10000 with 3 external batteries occupies 12U of rack space. The unit can also be deployed in tower configuration with floor-standing external battery enclosures.
How many external battery packs do I need for 30 minutes runtime?
At half load (5000 W), each SRT192RMBP2U adds approximately 8 minutes. For 30 minutes at half load, plan for 3–4 external enclosures. At full load (10000 W), each enclosure adds roughly 3 minutes — you would need 8–9 enclosures for 30 minutes. We size the exact configuration based on your actual load and runtime target.
Can you install the SRT10000 in a hospital or government facility?
Yes. We hold active federal contracts and regularly install SRT-class UPS in hospital imaging suites, operating rooms, government data centres, and secure facilities. Our technicians undergo security clearance and comply with facility-specific access procedures. Installation includes commissioning documentation formatted for accreditation and audit requirements.

APC Service Canada is an independent service provider. Not affiliated with APC by Schneider Electric®. All trademarks remain property of Schneider Electric.

Request a Quote